LEDinside says, the shortage of components is a structure issue. Plus, the current production capacity is beyond its limit. The lack of component surely will continue till end of 2010. Now with long lead times and booming demand, delivery times become the key factor for LED manufacturers to win the market. Under this circumstance, the only LED Linear high bay light, who has long-term supply chain strategy, can satisfy growing market demand with precious delivery time. After all, the lead time is the key element to overcome this crisis.
Compared to other LED lighting manufacturers with incredible long lead time, Aeon Lighting Technology Inc. (ALT) is still capable of keeping three day lead-time with its stable supplier chain, which has been established for several years. The CEO of ALT, James Liang, says, “In order to assure that the product of ALT has the best quality with the shortest lead time, we have spent a fortune stocking good amount of inventory. While the whole industry suffered the shortage of components and long lead-time, we are committed to ship out every single order within 3 to 14 days!” While price of components skyrocketed, ALT has maintained strategic partnership with suppliers to provide all products, including MR16, BR, Streetlight, and T8 tubes, to all clients, in order to protect our clients’ investment.
Aeon Lighting Technology Inc. has cutting-edge heat dissipation technology directly from partnered industrial server manufacturer, and more than 100 patents and safety certifications. Additionally it is the first led high bay light company to receive recognition from IF Product Design Award.Praxair will supply 10-metric-ton ISO container, configured for vapor-phase delivery of the ammonia, which is inherently safer to operate than liquid draw systems to Bridgelux. The high-capacity bulk system is capable of delivering sustained ammonia flow rates over 2,000 standard liters per minute, with a peak flow capacity over 3,000 standard liters per minute.
没有评论:
发表评论